• About Us
  • Mission & Vision
  • Power Plants
    • Gebze Elektrik Üretim LTD. ŞTİ.
    • Adapazarı Elektrik Üretim LTD. ŞTİ.
    • İzmir Elektrik Üretim LTD. ŞTİ.
  • Operation & Maintenance
  • Quality
  • HSE
  • Information Security
  • Energy Management
  •  TUR
  • Balmumcu Mah.,
    Zincirlikuyu Yolu, ENKA İnşaat A.Ş., No:10, 34349, 
    Beşiktaş, Istanbul, Türkiye

    Telefon: +90 (212) 355 81 00
    Faks: +90 (212) 275 24 61

    info@enkapower.com

Site Search
ENKA POWER
  • MENU
  • About Us
  • Mission & Vision
  • Power Plants
    • Gebze Elektrik Üretim LTD. ŞTİ.
    • Adapazarı Elektrik Üretim LTD. ŞTİ.
    • İzmir Elektrik Üretim LTD. ŞTİ.
  • Operation & Maintenance
  • Quality
  • HSE
  • Information Security
  • Energy Management
  • TUR

ENKA’s Adapazarı and Gebze Power Plants was selected as the Power Plant of the Year

Home| POWER| ENKA’s Adapazarı and Gebze Power Plants was selected as the Power Plant of the Year

28
Jan, 2011
By admin
ENKA’s Adapazarı and Gebze Power Plants was selected as the Power Plant of the Year
  • POWER

Turkish private power producer ENKA set a new world record for power plant availability over the 12-month period ending November 2010 based on recently upgraded GE F-technology gas turbines, the US power engineering giant said April 5.

GE said that ENKA’s Adapazarı and Gebze power plants, with a total installed capacity of 2,320 MW powered by GE Frame 9FA+e gas turbines, achieved 99.8% availability, last year, which is nearly 7% higher than the industry average for all F technology gas turbines over the last three years of 92% and a global record for F-class gas turbine technology. It added that the increased availability allowed the plants to generate an additional 1.3 TWh of electricity.

GE Energy implemented an efficiency improvement upgrade referred to as the Cooling Optimization Package in 2008 and 2009 on the gas turbines at both power plants, as a result of which output increased by 2% and average combined-cycle efficiency reached 55.7%.

The GE gas turbines at all three of ENKA’s plants – Adapazarı, Gebze and İzmir – operate under a 16-year contractual service agreement with GE. The three plants supply 15% of Turkey’s electricity, GE said.

“Power Plant of the Year with an availability of 99,8 %”

by the Power Magazine

In 2010, the 2,310 MV Adapazarı and Gebze Power Plants achieved 99.8% availability, which is nearly 7% higher than the industry average and a global record in F-class gas turbine technology. The new turbine upgrade is helping ENKA Power bolster Turkey’s evolving economy by improving its energy sector’s efficiency and productivity (resource: Power Magazine).

Turkish power company ENKA Power has world class risk management procedures being implemented on its operations in Adapazarı Power Plant (resource: Utility Week Magazine).

About admin

CALENDAR

May 2026
MTWTFSS
 123
45678910
11121314151617
18192021222324
25262728293031
« Apr    

Menu

  • About Us
  • Mission & Vision
  • Plant Operation and Maintenance
  • Quality
  • HSE
  • Information Security
  • Energy Management
  • ENKA Stock Information

Contact Us

  • Contact Us

Adapazarı Elektrik Üretim Ltd. Şti.

Gebze Elektrik Üretim Ltd. Şti.

İzmir Elektrik Üretim Ltd. Şti.

Follow Us

© 2023 ENKA Power Systems B.V. All rights reserved.

  • Privacy Policy
  • Terms of Use
  • Career
  • Contact Us