{"id":670,"date":"2016-04-08T06:42:04","date_gmt":"2016-04-08T06:42:04","guid":{"rendered":"http:\/\/172.30.28.12\/enkapower\/?p=670"},"modified":"2017-09-11T14:29:13","modified_gmt":"2017-09-11T11:29:13","slug":"enka-is-one-of-the-leading-epc-contractors","status":"publish","type":"post","link":"https:\/\/www.enkapower.com\/en\/enka-is-one-of-the-leading-epc-contractors\/","title":{"rendered":"ENKA is one of the leading EPC Contractors"},"content":{"rendered":"<div class=\"clearfix\" style=\"height: 20px\"><\/div>\n<p style=\"text-align: justify;\">ENKA is one of the leading EPC Contractors in power plants construction. ENKA\u2019s EPC experience in power plants comprises 6 Thermal Power Plants with a total capacity of 4,070 MW, 10 Natural Gas Fired CCPPs with a total capacity of 12,131 MW and 6 Natural Gas Fired SCPPs with a total capacity of 2,836 MW. With its 4 GW installed capacity , ENKA is the largest independent power producer of Turkey with a collective annual generation capacity of 32 billion kilowatt-hours, meeting 13% of Turkey\u2019s aggregate energy consumption .<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ENKA is one of the leading EPC Contractors in power plants construction. ENKA\u2019s EPC experience in power plants comprises 6 Thermal Power Plants with a total capacity of 4,070 MW, 10 Natural Gas Fired CCPPs with a total capacity of 12,131 MW and 6 Natural Gas Fired SCPPs with a total capacity of 2,836 MW. <a class=\"more-link\" href=\"https:\/\/www.enkapower.com\/en\/enka-is-one-of-the-leading-epc-contractors\/\">Continue reading <i class=\"fa fa-chevron-right\"><\/i><\/a><\/p>\n","protected":false},"author":1,"featured_media":671,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"gallery","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[10],"tags":[],"class_list":["post-670","post","type-post","status-publish","format-gallery","has-post-thumbnail","hentry","category-power","post_format-post-format-gallery"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/posts\/670","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/comments?post=670"}],"version-history":[{"count":0,"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/posts\/670\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/media\/671"}],"wp:attachment":[{"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/media?parent=670"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/categories?post=670"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/tags?post=670"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}