{"id":428,"date":"2000-08-01T07:19:15","date_gmt":"2000-08-01T07:19:15","guid":{"rendered":"http:\/\/172.30.28.12\/enkapower\/?p=428"},"modified":"2016-04-15T11:29:02","modified_gmt":"2016-04-15T11:29:02","slug":"power-generation-as-independent-power-producer-ipp","status":"publish","type":"post","link":"https:\/\/www.enkapower.com\/en\/power-generation-as-independent-power-producer-ipp\/","title":{"rendered":"Power Generation as Independent Power Producer (IPP)"},"content":{"rendered":"<div class=\"clearfix\" style=\"height: 20px\"><\/div>\n<p style=\"text-align: justify;\">The 3,854 MW Gebze, Adapazar\u0131 and \u0130zmir Natural Gas Fired Combined Cycle Power Plants have been realized by the Intergen-ENKA partnership as the largest private sector investment in Turkey, under a build, own and operate scheme. The three power plants started operation in 2002 and 2003.<\/p>\n<p style=\"text-align: justify;\">Having acquired\u00a0 its partner&#8217;s stake in its energy investments, ENKA currently generates approximately 30 billion kwh of electricity per year.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The 3,854 MW Gebze, Adapazar\u0131 and \u0130zmir Natural Gas Fired Combined Cycle Power Plants have been realized by the Intergen-ENKA partnership as the largest private sector investment in Turkey, under a build, own and operate scheme. The three power plants started operation in 2002 and 2003. Having acquired\u00a0 its partner&#8217;s stake in its energy investments, <a class=\"more-link\" href=\"https:\/\/www.enkapower.com\/en\/power-generation-as-independent-power-producer-ipp\/\">Continue reading <i class=\"fa fa-chevron-right\"><\/i><\/a><\/p>\n","protected":false},"author":1,"featured_media":390,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[10],"tags":[],"class_list":["post-428","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/posts\/428","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/comments?post=428"}],"version-history":[{"count":0,"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/posts\/428\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/media?parent=428"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/categories?post=428"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/tags?post=428"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}