{"id":423,"date":"2003-03-01T07:16:27","date_gmt":"2003-03-01T07:16:27","guid":{"rendered":"http:\/\/172.30.28.12\/enkapower\/?p=423"},"modified":"2016-04-15T11:28:56","modified_gmt":"2016-04-15T11:28:56","slug":"1523-mw-izmir-natural-gas-ccpp-was-completed-with-3-500-000-man-hours-wo-lti","status":"publish","type":"post","link":"https:\/\/www.enkapower.com\/en\/1523-mw-izmir-natural-gas-ccpp-was-completed-with-3-500-000-man-hours-wo-lti\/","title":{"rendered":"1,523 MW \u0130zmir Natural Gas CCPP was completed with 3.500.000 man-hours w\/o LTI"},"content":{"rendered":"<div class=\"clearfix\" style=\"height: 20px\"><\/div>\n<p style=\"text-align: justify;\">The \u0130zmir 1,523 MW Natural Gas Combined Cycle Power Plant built, owned and operated by ENKA consists of four combustion turbines\/generators, four heat recovery steam generators and two steam turbines\/generators.<\/p>\n<p style=\"text-align: justify;\">The construction of the project was completed with <strong>3.500.000<\/strong> man-hours without\u00a0LTI.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The \u0130zmir 1,523 MW Natural Gas Combined Cycle Power Plant built, owned and operated by ENKA consists of four combustion turbines\/generators, four heat recovery steam generators and two steam turbines\/generators. The construction of the project was completed with 3.500.000 man-hours without\u00a0LTI.<\/p>\n","protected":false},"author":1,"featured_media":394,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[10],"tags":[],"class_list":["post-423","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/posts\/423","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/comments?post=423"}],"version-history":[{"count":0,"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/posts\/423\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/media?parent=423"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/categories?post=423"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enkapower.com\/en\/wp-json\/wp\/v2\/tags?post=423"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}